Jereh Energy Services Corporation

Jereh Group

Horizontal Well Completions Services

Ball-drop Sleeve Multi-stage Fracturing Tools Technology
Multi-stage fracturing of horizontal well and ultra-long horizontal well.
Capable of providing total package services including completion design, provision of tools and running tools.
Coiled Tubing Cementing Sleeve Multi-stage Fracturing Technology
Jereh is capable of providing cementing frac sleeves and cementing accessories that are applicable to 4 1/2” and 5 1/2” casings. Jereh is also capable of providing package services including cementing design, separate stage optimization design, frac. design and field operations.
Coiled Tubing Bottom Packer Multi-stage Fracturing Technology
Multi-stage fracturing of conventional cased wells.
Wellbore left full drift.
Moving from 20 to 30 to 40 stage fracs and beyond.
Coiled Tubing Assisted Opening Cementing Sleeve Separate Stage Fracturing Technology
Jereh is capable of providing cementing frac sleeves and cementing accessories that are applicable to 4 1/2” and 5 1/2” casings. Jereh is also capable of providing package services including cementing design, separate stage optimization design, frac. design and field operations.



© Jereh Energy Services Corporation  [鲁ICP备09034147号] http://en.jereh-services.com/